Project Details

SR-97 (5600 SOUTH); 1900 WEST TO 2200 WEST, ROY

Category

About This Project

SUE Solutions successfully completed the utility investigations for this UDOT Region One project located in Roy, Utah. SUE Solutions contracted with the project’s design consultant to provide subsurface utility engineering in the form of Quality Level B horizontal designating), Quality Level C (storm drain survey and data gathering), and Quality Level A (test holes). The project consists of roadway reconstruction and widening, and the updating of the existing storm drain system. SUE Solutions researched the existing utility owners within the project area and used their existing mapping to designate the underground utilities within the most critical areas of the project. Extensive utility coordination with utility owners also took place. Upon completion of the Quality Level B and Quality Level C investigations, SUE Solutions designated, surveyed, and processed into CAD approximately 4,235 feet of existing underground utilities to Quality level B specifications, and surveyed, gathered information, and processed into CAD approximately 3,965 feet of storm drain and sewer facilities (Quality Level C). In addition, SUE Solutions also completed four (4) test holes at critical locations within the project gathering crucial utility information, vital to the project’s design. Utilities designated and accounted for included culinary water, secondary water, natural gas, electrical, phone, fiber optics, and CATV. SUE Solutions was able to complete the SUE investigations ahead of schedule and under budget.

Share