Project Details

13200 SOUTH PHASE 2 TEST HOLES, DRAPER CITY

Category

About This Project

SUE Solutions contracted with Draper City to conduct Quality Level A (test holes) SUE investigations for a City roadway project. The project is located along 13200 South from approximately 1200 East to Fort Street (900 East). The City project includes roadways reconstruction, roadway widening, and the installation of new curb and gutter and sidewalk. Due to UDOT’s need to have the information quickly, SUE Solutions coordinated the test hole activities with Draper City personnel to ensure the timely and accurate accounting of the information obtained through the SUE activities. SUE Solutions completed the SUE efforts in April of 2014, and was able to locate the utilities ahead of schedule and within budget. Twenty-five (25) test holes gathering critical utility information central to the project’s design were completed. Utility coordination efforts with existing utility owners, and local utility locating contractors also took place to account for additional utility information which was of benefit to Draper City and their design. SUE Solutions located utilities which included culinary water, phone, fiber optics, natural gas, and power.   The final deliverable to the design consultant consisted of a comprehensive final SUE report which contained existing utility conditions and their limitations, and Test Hole Data Sheets containing photographs of the located utilities, depth, material, utility owner, and general soil conditions.

Share