Project Details

SR-39; 12TH STREET ATMS INSTALLATION, WASHINGTON BLVD TO HARRISON BLVD, OGDEN, UTAH

Category

About This Project

SUE Solutions successfully completed the Quality Level ‘B’ and Quality Level ‘A’ subsurface utility engineering services for the SR-39; 12th Street ATMS installation project in Ogden City, Utah, for UDOT Region 1. This UDOT project was a fast track project that includes a mill and overlay of the existing 12th Street (SR-39) roadway as well as the installation of ATMS fiber facilities. SUE Solution’s Scope of Work included Quality Levels ‘D’ (existing utility owner mapping research and mapping), Quality Level ‘B’ designating (horizontal), and Quality Level ‘A’ (vertical) locating services within the areas where the ATMS facilities are to be installed. Approximately 5,000 feet of Level ‘B’ designated utilities were located, surveyed, and mapped, approximately 12,200 feet of existing utilities mapped to Quality Level ‘D’ standards and specifications, and 12 test holes were completed at critical design locations. Utility coordination efforts with existing utility owners, and local utility locating contractors also took place to account for those utilities that were not locatable by conventional means. SUE Solutions located utilities including culinary water, phone, CATV, fiber optics, power, and natural gas. SUE Solutions was able to complete this project on time and under budget. The final deliverable to UDOT consisted of a comprehensive final SUE report which contained existing utility conditions and their limitations, photographs of the utilities potholed and designated, survey data verifying the locations of the existing utilities, CAD files, and existing utility owner mapping.

Share